Environmental Classification for Projects and Activities in Saudi Arabia
We help developers, contractors, and facilities collect project data and review the activity, location, operations, and materials, to prepare environmental classification application requirements and link the project with appropriate studies, plans, and services.

Why start with environmental classification?
Delaying data collection or assuming requirements based solely on the activity name may lead to rework or delays in file preparation. Early review helps the project team know what data, documents, and plans are needed before moving on to the next stages.
Classification does not depend solely on project size
The nature of the activity, location, materials, operations, emissions, waste, and surrounding sensitive areas influence the potential requirements. Therefore, the needs of two projects with similar size or cost may vary.
How do we help prepare classification requirements?
Al-Baad Al-Bii'i does not issue the classification decision or permit, but it helps organize technical information, identify deficiencies, prepare the required file, and coordinate between project parties when needed.
Understanding the Activity and Project
Reviewing the nature of the activity, project phase, production capacity or scope of work, and proposed changes.
Site Review
Collecting city data, coordinates, area, surrounding land uses, and relevant environmental elements.
Compiling Technical Data
Listing expected operations, equipment, materials, energy, water, fuel, waste, and emissions.
Identify Gaps
Reviewing available documents, plans, and licenses to determine the data or proofs required to be completed.
Linking the Project to the Appropriate Service
Identifying the potential need for an environmental management plan, study, monitoring, records, or support to prepare the permit application.
Preparing the Work File
Organizing data and attachments in a way that helps the project owner complete the application procedures with the competent authority.
Data Required for Initial Review
Not all data needs to be available from the start. We start with what is available, then determine the required information according to the project type.
Facility or Project Data
Activity name, owner or authorized person, contact details, type of ownership, and project phase.
Location and Components
City, region, area, coordinates, site map, and surrounding areas.
Operations and Equipment
Description of the activity, operational lines, equipment, production capacity, and number of workers where applicable.
Materials and Resources
Raw materials, fuel, energy, water, their sources, and estimated quantities.
Waste and Emissions
Solid and liquid waste, hazardous materials, emissions, stacks, and treatment or disposal methods.
Available Documents
Schemes, previous licenses, commercial register, site contract, and relevant reports, studies, and plans.
Cases Requiring Review Before Completing Procedures
New project
Before starting construction or preparation, to determine expected data and requirements from the design stage.
Expansion or Modification
When adding a production line or equipment, or changing materials, energy, location, or scope of work.
Existing Facility
When renewing or updating documents or when a need arises to review operational requirements and records.
Supporting Forms and References for the Project
The project team can review these files to prepare initial information, then contact us to review the scope and data before starting application procedures.
Environmental Classification Form
A reference illustrating key activity, location, material, and project stage data.
Guideline List for Activity Classification
An initial reference for reviewing activities and their potential impacts.
Project Data Collection Form
A form for organizing operations, facilities, resources, and waste data before preparing the plan or study.
Compliance Guide for Construction Sites
A practical guide to site controls after the start of the construction and field application phase.
Services related to project classification
Preparation of environmental permit requirements
Support for preparing and reviewing permit and renewal application files according to the project scope.
Environmental Impact Assessment Studies
Evaluating potential impacts and identifying mitigation and monitoring measures for projects that require this.
Preparation of EMP environmental management plans
Preparing practical plans that link risks to responsibilities, controls, monitoring, and records.
Environmental Compliance for Construction Sites
Translating permit requirements and the plan into controls, inspections, and records during execution.
Frequently Asked Questions
Can project requirements be known from the activity name alone?
The activity name is a starting point, but it is usually not enough. The assessment requires data on the location, operations, materials, energy, waste, and the nature of the change or project phase.
Is environmental classification the same as an environmental permit?
No. Classification helps determine potential requirements and procedures, while the permit is an independent regulatory procedure according to what the competent authority decides.
Can the guideline checklist be used as a final decision?
No. It is a reference list for initial review, and it does not replace submitting the required data or the decision of the competent regulatory authority.
When should the classification be reviewed again?
When expanding the project, changing its activity, equipment, materials, location, or any element that may affect existing environmental commitments.
Do you help with filling out forms and gathering attachments?
Yes, we help organize technical data, review attachments, and identify shortcomings according to the project scope, without claiming to issue a decision or guarantee approval.
Start with an initial review of your project
Send the activity type, project city, implementation phase, and any available plan or license, and we will help you determine the required data and related services.
Professional Notice: Requirements change according to the project activity, location, data, conditions of the regulatory authority, and applicable regulations and guidelines. Al-Baad Al-Biyi provides technical support for preparing data and files, and this page does not represent a guarantee for issuing a permit, approving a classification, or accepting an application.