{"id":4153,"date":"2026-10-28T00:48:51","date_gmt":"2026-10-27T21:48:51","guid":{"rendered":"https:\/\/albuad.sa\/?p=4153"},"modified":"2026-10-28T00:48:51","modified_gmt":"2026-10-27T21:48:51","slug":"mining-environmental-studies-saudi-arabia","status":"publish","type":"post","link":"https:\/\/albuad.sa\/en\/mining-environmental-studies-saudi-arabia\/","title":{"rendered":"Environmental Studies and Permits for Mining and Exploration Projects in Saudi Arabia"},"content":{"rendered":"<article>Starts <strong>Environmental Studies for Mining Projects<\/strong> by understanding the site and proposed activities before setting up equipment or opening roads and drilling platforms. License boundaries alone do not clarify all risks; impacts may extend to valley channels, habitats, wells, and surrounding land uses. Therefore, the project owner needs to determine the appropriate environmental pathway early on, and prepare the required data and studies according to the activity, its stage, and classification.<\/p>\n<p>This guide explains the difference between the mining license and the environmental permit, the role of the scoping report and the environmental impact assessment study, the elements that should be reviewed before implementation, and how the Albuad Environmental Company helps organize studies and plans within the scope of service and valid license.<\/p>\n<h2>1. What are the environmental requirements for a mining or exploration project?<\/h2>\n<p><strong>Environmental requirements are determined based on the type of activities, location, project stage, and environmental classification.<\/strong> This may include an environmental and social impact management plan as part of the mining license requirements, an environmental management plan or an environmental impact assessment study within the environmental permitting pathway, in addition to monitoring, rehabilitation, and other applicable approvals.<\/p>\n<p>The required document cannot be selected based on a general description such as \"exploration project\" or \"mining site\". The practical starting point is to review the work program, activity boundaries, and surrounding receptors, and then verify the requirements with the relevant authorities.<\/p>\n<h2>2. What are environmental studies for mining projects?<\/h2>\n<p>They are technical works that study the relationship between project activities and the surrounding environment, identify potential impacts and their significance, available alternatives, and measures to avoid or mitigate harm. This includes reviewing desk information, appropriate surveys and measurements, analyzing results, and preparing the required documents.<\/p>\n<ul>\n<li>Description of works, equipment, and facilities during project phases.<\/li>\n<li>Identifying sensitive receptors and pathways for impact transmission to them.<\/li>\n<li>Collecting baseline data and assessing their adequacy.<\/li>\n<li>Comparing alternatives and determining management and monitoring procedures.<\/li>\n<li>Planning rehabilitation and closure according to the nature of the operations and requirements.<\/li>\n<\/ul>\n<p>The assessment is not limited to the extraction area; it may include roads, storage, generators, temporary camps, water works, and project-associated facilities.<\/p>\n<h2>3. What is the difference between reconnaissance, exploration, and exploitation?<\/h2>\n<p>Environmental questions change as the project transitions from information gathering to fieldwork and then to the development of extraction operations. The table generally illustrates the nature of the phases, while the rights and boundaries of each license remain subject to its conditions and the approved work program.<\/p>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Phase<\/th>\n<th scope=\"col\">Nature of operations<\/th>\n<th scope=\"col\">Environmental review focus<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Reconnaissance<\/td>\n<td>Data review, visits, and gathering information and samples within the license boundaries.<\/td>\n<td>Area sensitivity, boundaries of visits, and proposed fieldwork.<\/td>\n<\/tr>\n<tr>\n<td>Exploration<\/td>\n<td>Site study using geological, geophysical, and geochemical methods and authorized fieldwork.<\/td>\n<td>Impact of drilling rigs, trenches, tracks, and supporting facilities.<\/td>\n<\/tr>\n<tr>\n<td>Exploitation<\/td>\n<td>Development of raw materials and mineral extraction along with associated authorized operations and facilities.<\/td>\n<td>Impacts of construction, operation, resource and waste management, rehabilitation, and closure.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>4. Does the mining license replace the environmental permit?<\/h2>\n<p>The mining license and the environmental permit are two documents with different purposes. The former is related to mining activity rights and boundaries, while the environmental permit is related to the assessment of the activity and its environmental conditions. Compliance with each track must be verified on a case-by-case basis before commencing the respective work.<\/p>\n<p>The Taden platform clarifies that the exploration license application includes an environmental and social impact management plan, while the mining license procedures include the site environmental permit, the environmental and social impact management plan, and the rehabilitation and closure plan among its requirements.<\/p>\n<p>Additionally, further approvals related to the site, water, vegetation cover, or wildlife may apply; therefore, the issuance of one document does not automatically fulfill the remaining requirements.<\/p>\n<h2>5. What data determines the environmental track of the project?<\/h2>\n<p>Determining the track requires a description that can be reviewed on maps and on-site. The most important data includes:<\/p>\n<ul>\n<li>License type, application stage, and current project status.<\/li>\n<li>Site boundaries, coordinates, and actual footprint area of the operations.<\/li>\n<li>Locations of drilling, trenches, roads, storage, and camps if any.<\/li>\n<li>Number of equipment, fuel type, and proposed operating hours.<\/li>\n<li>Water sources, expected quantities, and the method of managing generated water.<\/li>\n<li>Surrounding receptors, previous studies, and permits.<\/li>\n<\/ul>\n<p>When the design is preliminary, assumptions and gaps are clearly recorded, and the data is then updated once the work program is finalized.<\/p>\n<h2>6. How does classification affect the environmental studies of mining projects?<\/h2>\n<p>The environmental activity classification is linked to the level of its impacts and characteristics in accordance with the requirements of the National Center for Environmental Compliance <strong>NCEC<\/strong>. The table shows the general track of documents in construction environmental permit services; whereas the specific project requirements are determined after reviewing its activity and classification.<\/p>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Environmental Category<\/th>\n<th scope=\"col\">Impact Level<\/th>\n<th scope=\"col\">Essential Documents in the Construction Pathway<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Category 1<\/td>\n<td>Minimal or low impacts.<\/td>\n<td>An environmental management plan from a licensed service provider, and a rehabilitation plan for activities required by the regulations.<\/td>\n<\/tr>\n<tr>\n<td>Category 2<\/td>\n<td>Moderate impacts.<\/td>\n<td>Category II Environmental Impact Assessment study from a licensed service provider.<\/td>\n<\/tr>\n<tr>\n<td>Category 3<\/td>\n<td>Severe impacts.<\/td>\n<td>Environmental Impact Assessment scoping report, followed by the detailed study after scoping report approval.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>The environmental activity category is neither the mining category nor the consulting office license category.<\/strong> Each classification has its own use, and one may not be used to infer the other or to assume that all mining activities belong to a single environmental category.<\/p>\n<h2>7. What is the difference between the required environmental documents?<\/h2>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">The Document<\/th>\n<th scope=\"col\">It's job<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Environmental Impact Assessment Scoping Report<\/td>\n<td>Identifies the issues, alternatives, data, and methodologies that the required study will address.<\/td>\n<\/tr>\n<tr>\n<td>Environmental Impact Assessment Study<\/td>\n<td>Analyzes the site condition, expected impacts, alternatives, mitigation, and residual effects.<\/td>\n<\/tr>\n<tr>\n<td>Environmental Management Plan<\/td>\n<td>Defines procedures, responsibilities, timing, verification evidence, and response to observations.<\/td>\n<\/tr>\n<tr>\n<td>Environmental and Social Impact Management Plan<\/td>\n<td>Addresses environmental and social aspects according to the requirements of the respective mining license.<\/td>\n<\/tr>\n<tr>\n<td>Rehabilitation and Closure Plan<\/td>\n<td>Outlines the management of affected areas, closure works, verification objectives, and required monitoring.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These documents must be coordinated to reflect the same project description, and work locations, management procedures, or responsibilities must not conflict between the license file and the permit file.<\/p>\n<h2>8. What does the Environmental Impact Assessment scoping report include?<\/h2>\n<p>The scoping report directs the study toward decision-influencing issues, rather than collecting excessive data that does not serve project evaluation. In the Category III track, the study is prepared according to the scope approved by the Center.<\/p>\n<ul>\n<li>Project boundaries, phases, facilities, and proposed alternatives.<\/li>\n<li>Environmental and social receptors and potential impact pathways.<\/li>\n<li>Available data and gaps that require surveying or measurement.<\/li>\n<li>Methodologies for assessing air, water, soil, noise, and habitats as needed.<\/li>\n<li>Cumulative impacts associated with other related activities.<\/li>\n<li>Methodology for comparing alternatives and preparing mitigation and monitoring procedures.<\/li>\n<\/ul>\n<p>Examples of important questions include: Does the equipment route cross a wadi course? Is the pad located near a sensitive habitat? Does traffic affect receptors located outside the license boundaries?<\/p>\n<h2>9. How is the baseline established in environmental studies for mining projects?<\/h2>\n<p>The baseline describes the state of the environment prior to the execution of works or before the proposed change in an existing project. It combines historical information, maps, site visits, and appropriate field measurements, while indicating the data date, accuracy, and limits of use.<\/p>\n<p>Survey locations, timing, and frequency are determined according to the study objectives, receptors, and requirements. It is not sufficient to choose easily accessible points if they do not represent impact sources or sensitive areas.<\/p>\n<p>Measurement methods, calibration, and quality control must be documented, and a chain of custody for samples must be used when necessary. Previous disturbances must also be distinguished from new works to avoid attributing all observations to the proposed project.<\/p>\n<h2>10. How are dust, noise, and emission impacts assessed?<\/h2>\n<p>Vehicle movement on unpaved roads, pad preparation, excavation, material transport, and generator operation are reviewed. Receptor proximity, wind direction, working hours, and equipment distribution are studied to determine the need for appropriate measurement or modeling.<\/p>\n<p>Management procedures may include regulating speeds and routes, equipment maintenance, optimizing generator and storage locations, and applying site-appropriate dust controls and resource availability. The procedure is chosen based on its effectiveness and other impacts, including water consumption.<\/p>\n<p>No standardized buffer distances or operating limits are set for all projects without support from site assessment and approved requirements.<\/p>\n<h2>11. How are soil, waste, and used materials reviewed?<\/h2>\n<p>The assessment includes the disturbance area, cut and fill works, topsoil management, in addition to fuel, oil, material, and drilling fluid locations. The probabilities of leakage, erosion, and pollutant transport to soil or water are reviewed.<\/p>\n<ul>\n<li>Identify waste types, estimated quantities, and sources.<\/li>\n<li>Evaluate the characteristics of excavation spoils, water, and used materials when necessary.<\/li>\n<li>Determine caching, containment, transport, and processing responsibilities.<\/li>\n<li>Establish spill response procedures and document handling and verification.<\/li>\n<\/ul>\n<p>Not all mining waste or excavation byproducts are treated as having identical characteristics; the nature of ores or materials may require specialized studies, such as assessing the potential for acid generation or metal release when indicators warrant doing so.<\/p>\n<h2>12. Why is the study of surface and groundwater important?<\/h2>\n<p>The relationship of operations to valleys, flood pathways, natural drainage, wells, and known water receptors is reviewed. The proposed water source, its usage, and how to manage accumulated or operation-generated water are also examined.<\/p>\n<p>Excavations, roads, or storage areas may require specialized review for drainage and pollutant migration risks. The scope of samples and measurements is determined based on hazard sources and migration pathways, not merely by the presence of a nearby water point.<\/p>\n<p>Furthermore, the appearance of a watercourse on a map does not prove permanent flow; the relationship between surface and groundwater requires adequate data and verification according to site conditions.<\/p>\n<h2>13. How are habitats and biodiversity studied?<\/h2>\n<p>Habitats, vegetation, wildlife indicators, and areas that may be affected by opening pathways, equipment movement, lighting, and noise are identified. Surveys are planned taking into account the season and the species or habitats of concern.<\/p>\n<p>The results help identify avoidance areas, review alternatives for platforms and roads, and establish work controls and monitoring. The absence of visible vegetation in a satellite image is not sufficient evidence of low environmental sensitivity.<\/p>\n<p>When there are indicators of protected areas, species, or resources requiring additional action, requirements are reviewed with the competent authority before adopting the final work arrangement.<\/p>\n<h2>14. How are land uses and social impacts reviewed?<\/h2>\n<p>The review includes population clusters, farms, grazing, roads, facilities, utilities, rights, and existing uses. The transport route or access road may be more important than the drilling site itself for certain receptors.<\/p>\n<p>Relevant issues such as traffic, dust, and accessibility to resources or sites are identified, and management, communication, and feedback procedures are documented according to the project scope and requirements.<\/p>\n<p>The source and limitations of information must be demonstrated, and land should not be assumed to be unused simply because no buildings or facilities appear on it.<\/p>\n<h2>15. How do maps and alternatives comparison help in site selection?<\/h2>\n<p>Geographic Information Systems combine operational sites with layers of topography, valleys, habitats, and land uses. They help compare access routes, platform locations, and facilities before finalizing the design.<\/p>\n<p><strong>Hypothetical example:<\/strong> A route using an existing road can be compared to a route requiring clearing new land. The decision includes the area of disturbance, valley crossings, habitats, and equipment movement requirements, along with field data verification.<\/p>\n<p>Maps are a tool to support decisions; they do not replace regulatory approval or the required survey. Likewise, unstudied areas should be considered areas with data gaps, not automatically low-sensitivity areas.<\/p>\n<h2>16. What are the steps for preparing environmental studies for mining projects?<\/h2>\n<ol>\n<li><strong>Project File Review:<\/strong> Compile licenses, boundaries, work program, facilities, materials, and previous studies.<\/li>\n<li><strong>Path Determination:<\/strong> Review classification, documents, applicable approvals, and relevant entities.<\/li>\n<li><strong>Scoping:<\/strong> Prepare a scoping report when required, or determine the appropriate technical scope of work for the relevant document.<\/li>\n<li><strong>Data Collection:<\/strong> Execute appropriate surveys, measurements, and analyses, and ensure their quality control.<\/li>\n<li><strong>Assessment:<\/strong> Analyze impacts, alternatives, mitigation, and residual impacts.<\/li>\n<li><strong>Output Preparation:<\/strong> Consolidate the study, plans, maps, monitoring programs, and responsibilities.<\/li>\n<li><strong>Review and Follow-up:<\/strong> Address comments, complete requirements, and then follow up on commitments after issuing the necessary approvals.<\/li>\n<\/ol>\n<p>This sequence helps uncover data gaps early, but it does not guarantee agency approval or exempt from fulfilling additional site-specific requirements.<\/p>\n<h2>17. What is the cost and preparation duration of environmental studies for mining projects?<\/h2>\n<p>The cost is determined by the scope of work, not just the license area. A limited-space site may require specialized surveys, while another site may have recent data available that can be used after review.<\/p>\n<ul>\n<li>Environmental category and the type of document required.<\/li>\n<li>Number of work areas, their distance from each other, and accessibility.<\/li>\n<li>Required measurements, samples, analyses, and modeling.<\/li>\n<li>The need for a seasonal survey or additional visits.<\/li>\n<li>Quality of historical data and the scale of design modifications.<\/li>\n<\/ul>\n<p>The proposal should clarify the fees for document preparation, fieldwork, and analyses, what reviews are included, and any government fees paid separately. The duration for preparing the study must also be separated from the duration of its review by the competent authority; the total duration is affected by file completeness, inquiries, and requirements.<\/p>\n<h2>18. What documents are preferred to be prepared before requesting the study?<\/h2>\n<ul>\n<li>A copy of the mining license or application details, activity type, and mineral.<\/li>\n<li>Site boundaries in KML, KMZ, Shapefile, or GeoPackage format when available, along with the coordinate system and data source.<\/li>\n<li>Map of drilling locations, trenches, roads, storage, and facilities.<\/li>\n<li>Description of equipment, materials, fuel, water, and operating hours.<\/li>\n<li>Work program, schedule, and alternatives under study.<\/li>\n<li>Photos, surveys, studies, and previous monitoring results.<\/li>\n<li>Permits, letters, requirements, and comments issued for the project.<\/li>\n<\/ul>\n<p>Among the mistakes that delay preparation are: mismatched coordinates between files, failure to update the plan, overlooking temporary facilities, and using a study for another project without evaluating its suitability. Reviewing data completeness helps identify shortages before fieldwork begins.<\/p>\n<h2>19. Frequently Asked Questions about Environmental Studies and Permits for Mining<\/h2>\n<h3>Does every mineral exploration project require a full Environmental Impact Assessment (EIA)?<\/h3>\n<p>This cannot be generalized. The required document is determined after reviewing the actual operations, their location, stage, environmental classification, and applicable requirements; the mining license plan may differ from the documents required for the environmental permitting path.<\/p>\n<h3>Is the scoping report an alternative to the Environmental Impact Assessment study?<\/h3>\n<p>No. The scoping report defines the study topics, methodologies, and data, and the Category III study is prepared after the approval of the scoping report in accordance with the Center's requirements.<\/p>\n<h3>Is Category I the highest in environmental impact?<\/h3>\n<p>No. Category I has minimal or low impacts, Category II is medium, and Category III is significant. These categories should not be confused with mineral categories or the service provider's licensing classification.<\/p>\n<h3>Can a geological study be used instead of an environmental study?<\/h3>\n<p>A geological study helps understand the site, but it does not necessarily cover air, noise, habitats, water, and land use. Its data can be utilized within the environmental study after reviewing its suitability.<\/p>\n<h3>Can the assessment be started before the design is completed?<\/h3>\n<p>Yes, an initial review of constraints and sensitivity can be conducted using available data, while clarifying assumptions. The assessment is then updated when work and facility locations and the implementation program are finalized.<\/p>\n<h3>When is the environmental study or plan reviewed?<\/h3>\n<p>When there is a change in the activity, drilling locations, facilities, scope of work, or the emergence of new data or requirements, the need to update the documents or modify the permit is reviewed in coordination with the competent authority.<\/p>\n<h2>20. How does Albuad Environmental Company support your project?<\/h2>\n<p>Albuad Environmental Company helps exploration and mining project owners organize site information, define the scope of environmental studies and appropriate plans for mining projects, and link spatial data with survey and assessment results and management procedures.<\/p>\n<ul>\n<li>Reviewing the project description, boundaries, and available data and studies.<\/li>\n<li>Identifying environmental and spatial gaps and survey and measurement needs.<\/li>\n<li>Supporting the preparation of studies, plans, and permit requirements within the scope of the license and service.<\/li>\n<li>Organizing assessment, monitoring, rehabilitation, and responsibility outputs.<\/li>\n<li>Identifying works that require qualified specialized laboratories or entities within the scope of work.<\/li>\n<\/ul>\n<p>To start reviewing your project, prepare the site boundaries, license type, project phase, work program, and available permits. This data helps clearly define the scope of work, outputs, and proposed schedule.<\/p>\n<p><strong>To contact Albuad Environmental Company:<\/strong> WhatsApp <bdi>+966535733690<\/bdi> Or email <bdi>info@albuad.sa<\/bdi>.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>\u062a\u0628\u062f\u0623 \u0627\u0644\u062f\u0631\u0627\u0633\u0627\u062a \u0627\u0644\u0628\u064a\u0626\u064a\u0629 \u0644\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u062a\u0639\u062f\u064a\u0646 \u0628\u0641\u0647\u0645 \u0627\u0644\u0645\u0648\u0642\u0639 \u0648\u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0645\u0642\u062a\u0631\u062d\u0629 \u0642\u0628\u0644 \u062a\u062c\u0647\u064a\u0632 \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0623\u0648 \u0641\u062a\u062d \u0627\u0644\u0637\u0631\u0642 \u0648\u0645\u0646\u0635\u0627\u062a \u0627\u0644\u062d\u0641\u0631. \u0641\u062d\u062f\u0648\u062f \u0627\u0644\u0631\u062e\u0635\u0629 \u0648\u062d\u062f\u0647\u0627 \u0644\u0627 \u062a\u0648\u0636\u062d \u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u062e\u0627\u0637\u0631\u061b \u0648\u0642\u062f \u062a\u0645\u062a\u062f \u0627\u0644\u062a\u0623\u062b\u064a\u0631\u0627\u062a \u0625\u0644\u0649 \u0645\u062c\u0627\u0631\u064a \u0627\u0644\u0623\u0648\u062f\u064a\u0629 \u0648\u0627\u0644\u0645\u0648\u0627\u0626\u0644 \u0648\u0627\u0644\u0622\u0628\u0627\u0631 \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0627\u062a \u0627\u0644\u0623\u0631\u0627\u0636\u064a \u0627\u0644\u0645\u062d\u064a\u0637\u0629. \u0644\u0630\u0644\u0643 \u064a\u062d\u062a\u0627\u062c \u0635\u0627\u062d\u0628 \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0625\u0644\u0649 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0645\u0633\u0627\u0631 \u0627\u0644\u0628\u064a\u0626\u064a \u0627\u0644\u0645\u0646\u0627\u0633\u0628 \u0645\u0628\u0643\u0631\u064b\u0627\u060c \u0648\u062a\u062c\u0647\u064a\u0632 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u062f\u0631\u0627\u0633\u0627\u062a \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0628\u062d\u0633\u0628 \u0627\u0644\u0646\u0634\u0627\u0637 \u0648\u0645\u0631\u062d\u0644\u062a\u0647 \u0648\u062a\u0635\u0646\u064a\u0641\u0647. \u064a\u0648\u0636\u062d \u0647\u0630\u0627 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4154,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[],"class_list":["post-4153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-39"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"_links":{"self":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts\/4153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/comments?post=4153"}],"version-history":[{"count":1,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts\/4153\/revisions"}],"predecessor-version":[{"id":4155,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts\/4153\/revisions\/4155"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/media\/4154"}],"wp:attachment":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/media?parent=4153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/categories?post=4153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/tags?post=4153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}