{"id":3371,"date":"2026-08-24T18:40:41","date_gmt":"2026-08-24T15:40:41","guid":{"rendered":"https:\/\/albuad.sa\/?p=3371"},"modified":"2026-09-16T21:04:12","modified_gmt":"2026-09-16T18:04:12","slug":"%d8%a7%d9%84%d8%aa%d8%ad%d9%82%d9%82-%d8%a7%d9%84%d8%a8%d9%8a%d8%a6%d9%8a-%d9%88%d9%85%d8%b9%d8%a7%d9%84%d8%ac%d8%a9-%d8%a7%d9%84%d8%ad%d9%81%d8%b1","status":"publish","type":"post","link":"https:\/\/albuad.sa\/en\/%d8%a7%d9%84%d8%aa%d8%ad%d9%82%d9%82-%d8%a7%d9%84%d8%a8%d9%8a%d8%a6%d9%8a-%d9%88%d9%85%d8%b9%d8%a7%d9%84%d8%ac%d8%a9-%d8%a7%d9%84%d8%ad%d9%81%d8%b1\/","title":{"rendered":"Environmental verification, remediation of exploratory drilling, and completion of site preparation work for a non-operational mining site."},"content":{"rendered":"<p><!-- Breadcrumb Navigation --><\/p>\n<nav class=\"breadcrumb-nav\" aria-label=\"breadcrumb\"><\/nav>\n<header class=\"article-header\">\n<p class=\"article-subtitle\">A complete case study of a non-metallic mining site in Saudi Arabia: from identifying open pits to backfilling, leveling, and issuing a documented completion report<\/p>\n<div class=\"article-meta\"><span class=\"author\">Albuad Enviromental Team for Environmental Consulting<\/span><br \/>\n<span class=\"date\">Last updated: August 24, 2026<\/span><br \/>\n<span class=\"reading-time\">Reading time: 8 minutes<\/span><\/div>\n<\/header>\n<p><!-- Table of Contents --><\/p>\n<nav class=\"toc\" aria-label=\"Table of Contents\">\n<h2>Table of Contents<\/h2>\n<ol>\n<li><a href=\"#intro\">Introduction: Why does a non-operational site need environmental verification?<\/a><\/li>\n<li><a href=\"#scope\">Scope of work and services provided<\/a><\/li>\n<li><a href=\"#methodology\">Implementation Methodology: From Desk Review to Field Inspection<\/a><\/li>\n<li><a href=\"#findings\">Key environmental observations<\/a><\/li>\n<li><a href=\"#remediation\">Treatment, backfilling and leveling works<\/a><\/li>\n<li><a href=\"#before-after\">Before\/After Matrix and Proof State<\/a><\/li>\n<li><a href=\"#results\">Follow-up results and closure of procedures<\/a><\/li>\n<li><a href=\"#lessons\">Technical lessons learned<\/a><\/li>\n<li><a href=\"#faq\">Frequently Asked Questions<\/a><\/li>\n<li><a href=\"#related\">Related services<\/a><\/li>\n<\/ol>\n<\/nav>\n<p><!-- Introduction --><\/p>\n<section id=\"intro\">\n<h2>Introduction: Why does a non-operational site need environmental verification?<\/h2>\n<p>Sites <strong>Non-metallic mining<\/strong> It is one of the industrial sites that leaves a clear environmental impact after operations cease, especially when it leaves <strong>Open exploratory pits<\/strong> Piles of excavated material and unsecured dirt tracks. In this study, we review the team's experience. <a href=\"https:\/\/albuad.sa\/en\/\">The environmental dimension of environmental consulting<\/a> In procedure <strong>Environmental verification of the current situation<\/strong> For a non-operational site, then follow up on implementation <strong>Backfilling and leveling works<\/strong> And issue <strong>Completion Report<\/strong> Documented with field evidence.<\/p>\n<p>This work comes in a context of growing interest in<strong>Addressing mining-affected sites<\/strong> In Saudi Arabia, specifically with the growing demands <strong>Mining licenses<\/strong> Which requires the preparation of environmental settlement and rehabilitation plans that comply with environmental sustainability standards.<\/p>\n<div class=\"highlight-box\"><strong>Main objective:<\/strong> Transforming the results of status verification into documentable closure actions reduces environmental and operational risks and supports the site's regulatory path.<\/div>\n<\/section>\n<p><!-- Project Summary --><\/p>\n<section id=\"summary\">\n<h2>Project Summary<\/h2>\n<table class=\"project-summary-table\">\n<tbody>\n<tr>\n<th>Sector<\/th>\n<td>Industrial facility associated with non-metallic mining activity<\/td>\n<\/tr>\n<tr>\n<th>Service<\/th>\n<td>Checking the current situation and closing environmental observations<\/td>\n<\/tr>\n<tr>\n<th>Project phase<\/th>\n<td>Non-operational site \u2013 excavation work has been completed and affected areas leveled.<\/td>\n<\/tr>\n<tr>\n<th>Scope of work<\/th>\n<td>Document review, field inspection, backfilling and leveling, implementation controls, post-completion verification<\/td>\n<\/tr>\n<tr>\n<th>Assignment status<\/th>\n<td>Complete and documented with a completion report and before, during, and after photos<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/section>\n<p><!-- Background --><\/p>\n<section id=\"background\">\n<h2>Project background<\/h2>\n<p>The assignment to document began <strong>Current environmental and operational status<\/strong> For a non-operational site, as the preview showed <strong>Open exploratory drilling<\/strong> Excavation debris and earthworks. Following the issuance of the initial report, the work extended to documenting the implementation of the required treatment through <strong>Filling the holes<\/strong> Settlement of affected areas and verification of site condition after completion.<\/p>\n<p>The case study was built on two interconnected phases:<\/p>\n<ol>\n<li><strong>Defining the baseline and apparent risks:<\/strong> Monitoring the actual condition of the site and documenting environmental observations.<\/li>\n<li><strong>Follow up on closing the comments:<\/strong> Carry out the backfilling and leveling works and issue a completion report accompanied by field photos.<\/li>\n<\/ol>\n<p>The first challenge was <strong>Separating the effects of previous works<\/strong> The inspection revealed evidence of actual operation. The site showed open pits, piles of excavated material, and earthworks; however, these features alone are not sufficient to prove ongoing operational activity. It was necessary to look for direct operating indicators, such as operating equipment, production-related vehicle movement, loading or screening areas, and emissions or operating noise.<\/p>\n<p>The second challenge was <strong>Risk assessment based solely on visual evidence<\/strong>The third challenge was to formulate recommendations that were appropriate to the situation: protecting the soil and public safety, preventing the spread of the impact, and supporting the regulatory process.<\/p>\n<\/section>\n<p><!-- Scope --><\/p>\n<section id=\"scope\">\n<h2>Scope of work of Environmental Dimension Company<\/h2>\n<ul>\n<li>Review the regulatory requirement and available technical documentation to determine the purpose and scope of the verification.<\/li>\n<li>to implement <strong>Field visit<\/strong> A systematic visual inspection of the general condition of the site and the surrounding environment.<\/li>\n<li>Checking for the presence or absence of operational work and indicators of direct activity at the time of inspection.<\/li>\n<li>Monitoring pits, piles of material, tracks, debris, and any visible signs of emissions or leaks.<\/li>\n<li>Assessing aspects related to soil, dust, noise, debris, vegetation cover, and safety.<\/li>\n<li>Classifying the level of observations made and formulating actionable procedures and recommendations.<\/li>\n<li>Preparing <strong>Technical Report<\/strong> Regarding the current situation, while maintaining documentation evidence in the project's internal records.<\/li>\n<\/ul>\n<\/section>\n<p><!-- Methodology --><\/p>\n<section id=\"methodology\">\n<h2>Implementation Methodology: From Desk Review to Field Inspection<\/h2>\n<h3>1. Desk review and setting verification limits<\/h3>\n<p>The team began by reviewing the organizational purpose of the assignment and the available information about the nature of the activity and the site's condition. This review was used to define the screening questions: Are there any operational works taking place at the time of the visit? What physical impacts are present? Are there any visible sources of pollution? What measures are necessary before resuming or commencing any work?<\/p>\n<h3>2. Field surveys based on specific indicators<\/h3>\n<p>A field tour was conducted that included the site area and its immediate surroundings. The visit was not limited to taking general photographs; rather, operational indicators, ground surface condition, excavations and piles of material, paths, debris, sources of noise and dust, vegetation cover, and visible sensitive receptors were examined.<\/p>\n<h3>3. Cross-checking and risk assessment<\/h3>\n<p>Field observations were compared to the verification range defined at the start of the work. A distinction was made between the absence of an apparent indicator and proof of the absence of contamination. the risks were then assessed according to the probability of occurrence and the severity of the impact, with priority given to open pits, potential dust, and debris accumulation.<\/p>\n<\/section>\n<p><!-- Findings --><\/p>\n<section id=\"findings\">\n<h2>Key environmental observations<\/h2>\n<p>The evidence was based on an examination of the basic condition, photos of the backfilling and leveling being carried out with the appropriate equipment, and then photos of the verification after completion.<\/p>\n<table class=\"findings-table\">\n<thead>\n<tr>\n<th>Environmental element<\/th>\n<th>Technical Note<\/th>\n<th>Significance<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>operational status<\/strong><\/td>\n<td>No operating equipment or production-related operational activity was observed at the time of inspection.<\/td>\n<td>The site is not operational at the time of visit.<\/td>\n<\/tr>\n<tr>\n<td><strong>Previous effects<\/strong><\/td>\n<td>The presence of open pits, piles of materials, and dirt tracks resulting from previous interventions.<\/td>\n<td>It needs proper adjustment, documentation, and processing.<\/td>\n<\/tr>\n<tr>\n<td><strong>Soil and Earth's Surface<\/strong><\/td>\n<td>Exposed surface and loose materials that are susceptible to agitation and erosion.<\/td>\n<td>Possibility of dust blowing and localized surface deterioration.<\/td>\n<\/tr>\n<tr>\n<td><strong>air and dust<\/strong><\/td>\n<td>There are no visible operational emissions, with the site susceptible to dust being stirred up by wind or vehicle movement.<\/td>\n<td>The need for controls when resuming business.<\/td>\n<\/tr>\n<tr>\n<td><strong>Noise:<\/strong><\/td>\n<td>No apparent operational noise sources were detected.<\/td>\n<td>This corresponds to the absence of operation during the visit.<\/td>\n<\/tr>\n<tr>\n<td><strong>Waste<\/strong><\/td>\n<td>A limited amount of debris was detected in one of the depressions.<\/td>\n<td>Systematic removal and documentation of the procedure are required.<\/td>\n<\/tr>\n<tr>\n<td><strong>Vegetation<\/strong><\/td>\n<td>Limited and scattered desert cover without density or sensitive habitats apparent within the scope of the examination.<\/td>\n<td>Avoid unnecessary removal.<\/td>\n<\/tr>\n<tr>\n<td><strong>Environmental safety<\/strong><\/td>\n<td>Unsecured excavations may cause falls, collapse of sides, or accumulation of debris.<\/td>\n<td>Low to moderate risks that require control.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/section>\n<p><!-- Remediation --><\/p>\n<section id=\"remediation\">\n<h2>Treatment, backfilling and leveling works<\/h2>\n<p>Implementation began by identifying locations <strong>Exploratory drilling<\/strong> Within the scope of the treatment and field review of its condition. Then leveling equipment was used for<strong>Filling the holes<\/strong> The low-lying areas were filled in, utilizing the excavated soil itself and avoiding the use of waste or contaminating materials in the backfilling. The ground surface was then leveled to eliminate differences in elevation and improve site evenness.<\/p>\n<p>The treatment included edges and unsafe areas, and cleaning the work area after implementation. It was applied during the work. <strong>Environmental and operational controls<\/strong> Should include:<\/p>\n<ul>\n<li>Minimize dust generation as much as possible.<\/li>\n<li>Dumping waste into pits is prohibited.<\/li>\n<li>Avoid creating additional pits or deformities.<\/li>\n<li>Inspect the stomach to prevent leakage of fuel or oil.<\/li>\n<li>Restricting access to work areas and using appropriate protective equipment.<\/li>\n<\/ul>\n<h3>Field evidence: before processing<\/h3>\n<figure><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/albuad.sa\/wp-content\/uploads\/2026\/08\/Screenshot_3.webp\" alt=\"\u062d\u0641\u0631\u0629 \u0627\u0633\u062a\u0643\u0634\u0627\u0641\u064a\u0629 \u0645\u0641\u062a\u0648\u062d\u0629 \u0630\u0627\u062a \u062c\u0648\u0627\u0646\u0628 \u063a\u064a\u0631 \u0645\u0624\u0645\u0646\u0629 \u0645\u0639 \u0648\u062c\u0648\u062f \u0645\u062e\u0644\u0641\u0627\u062a \u062f\u0627\u062e\u0644\u0647\u0627 \u0642\u0628\u0644 \u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0631\u062f\u0645 \u0648\u0627\u0644\u062a\u0633\u0648\u064a\u0629 \u0627\u0644\u0628\u064a\u0626\u064a\u0629\" width=\"800\" height=\"360\" \/><figcaption>An open pit with unsecured sides, with a limited amount of waste inside at the time of inspection.<\/figcaption><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/albuad.sa\/wp-content\/uploads\/2026\/08\/Screenshot_4.webp\" alt=\"\u062d\u0641\u0631\u0629 \u0633\u0637\u062d\u064a\u0629 \u0648\u0646\u0648\u0627\u062a\u062c \u062d\u0641\u0631 \u0645\u0643\u0634\u0648\u0641\u0629 \u062a\u062f\u0639\u0645 \u0645\u0644\u0627\u062d\u0638\u0629 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0644\u0631\u062f\u0645 \u0623\u0648 \u0627\u0644\u062a\u0633\u0648\u064a\u0629 \u0648\u0641\u0642 \u0627\u0644\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0645\u0639\u062a\u0645\u062f\u0629\" width=\"800\" height=\"360\" \/><figcaption>A shallow excavation and exposed excavation debris, which supports the observation of the need for insurance, backfilling or leveling in accordance with the approved requirements.<\/figcaption><\/figure>\n<h3>Field evidence: during and after treatment<\/h3>\n<figure><img decoding=\"async\" src=\"https:\/\/albuad.sa\/wp-content\/uploads\/2026\/08\/Screenshot_5.webp\" alt=\"\u062a\u0646\u0641\u064a\u0630 \u0631\u062f\u0645 \u0625\u062d\u062f\u0649 \u0627\u0644\u062d\u0641\u0631 \u0627\u0644\u0627\u0633\u062a\u0643\u0634\u0627\u0641\u064a\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0627\u062a\u062c \u0627\u0644\u062d\u0641\u0631 \u0627\u0644\u0645\u0646\u0627\u0633\u0628 \u0648\u0645\u0639\u062f\u0629 \u0627\u0644\u062a\u0633\u0648\u064a\u0629 \u0641\u064a \u0645\u0648\u0642\u0639 \u062a\u0639\u062f\u064a\u0646\u064a \u063a\u064a\u0631 \u062a\u0634\u063a\u064a\u0644\u064a\" width=\"800\" height=\"360\" \/><figcaption>Backfilling one of the pits using the appropriate excavated material and leveling equipment.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/albuad.sa\/wp-content\/uploads\/2026\/08\/Screenshot_6.webp\" alt=\"\u062d\u0627\u0644\u0629 \u0627\u0644\u0633\u0637\u062d \u0628\u0639\u062f \u0627\u0633\u062a\u0643\u0645\u0627\u0644 \u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0631\u062f\u0645 \u0648\u0627\u0644\u062a\u0633\u0648\u064a\u0629 \u0636\u0645\u0646 \u0646\u0637\u0627\u0642 \u0627\u0644\u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u0628\u064a\u0626\u064a\u0629 \u0644\u0644\u0645\u0648\u0642\u0639 \u0627\u0644\u062a\u0639\u062f\u064a\u0646\u064a\" width=\"800\" height=\"360\" \/><figcaption>Surface condition after completion of backfilling and leveling within the treatment area.<\/figcaption><\/figure>\n<\/section>\n<p><!-- Before\/After Matrix --><\/p>\n<section id=\"before-after\">\n<h2>Matrix of indicators before\/after and proof status<\/h2>\n<p>The matrix displays the baseline, the performed processing, the status after the procedure, and the closure evidence extracted from the completion report and field images.<\/p>\n<table class=\"before-after-table\">\n<thead>\n<tr>\n<th>Index<\/th>\n<th>Before the procedure<\/th>\n<th>Closing standard<\/th>\n<th>After the procedure<\/th>\n<th>Proof case<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>open pits<\/strong><\/td>\n<td>Open and unsecured pits.<\/td>\n<td>Demarcation, backfilling, and leveling.<\/td>\n<td>The area has been backfilled and leveled; there are no open pits in the treated area.<\/td>\n<td>Completion report and photos.<\/td>\n<\/tr>\n<tr>\n<td><strong>Waste<\/strong><\/td>\n<td>Limited debris in one of the depressions.<\/td>\n<td>Prevent waste and pollutants from entering and clean the site.<\/td>\n<td>The report documented the use of appropriate materials and the cleanliness of the area.<\/td>\n<td>Description and pictures.<\/td>\n<\/tr>\n<tr>\n<td><strong>Surface and drilling products<\/strong><\/td>\n<td>Piles and differences in elevation.<\/td>\n<td>Backfill with suitable excavated material and level the surface.<\/td>\n<td>A flatter and less dangerous surface.<\/td>\n<td>Photos during and after.<\/td>\n<\/tr>\n<tr>\n<td><strong>Public safety<\/strong><\/td>\n<td>Risks of falls, tripping, collapse of edges, and water accumulation.<\/td>\n<td>Filling the holes and finishing the edges.<\/td>\n<td>Reduced risk in the treated area.<\/td>\n<td>Preview after completion.<\/td>\n<\/tr>\n<tr>\n<td><strong>Dust and leaks<\/strong><\/td>\n<td>Dust and potential leaks during implementation.<\/td>\n<td>Reduce dust and check the stomach.<\/td>\n<td>No visible leaks; no quantitative measurement of dust.<\/td>\n<td>Procedural and visual proof.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/section>\n<p><!-- Results --><\/p>\n<section id=\"results\">\n<h2>Follow-up results and closure of procedures<\/h2>\n<ul>\n<li>Document <strong>Completion Report<\/strong> Carrying out backfilling and leveling works for areas affected by exploratory drilling.<\/li>\n<li>Confirmed <strong>Post-implementation inspection<\/strong> The absence of open pits or hazardous low-lying areas within the treatment area.<\/li>\n<li>The site surface has become more level, and the risks of falls, tripping, edge collapse, and water and debris accumulation have decreased.<\/li>\n<li>The images showed the use of appropriate equipment for backfilling and leveling, with documentation of the implementation phases and the condition of the surface after completion.<\/li>\n<li>The recommendation continues.<strong>Periodic inspection tours<\/strong>Monitoring the site after the rains, and not carrying out new excavations before completing the regulatory approvals.<\/li>\n<\/ul>\n<\/section>\n<p><!-- Lessons Learned --><\/p>\n<section id=\"lessons\">\n<h2>Technical lessons learned<\/h2>\n<p>The project demonstrated the importance <strong>Converting status verification results into verifiable closure procedures<\/strong>Open pits were not recorded as merely a descriptive observation; rather, they were linked to executive steps that included identification, backfilling, leveling, and verification after completion.<\/p>\n<p>The experience also confirmed the necessity of:<\/p>\n<ol>\n<li>precise distinction between <strong>Previous effects<\/strong> And the actual operational activity.<\/li>\n<li>Documenting each stage<strong>Anonymous images<\/strong> And a precise technical description.<\/li>\n<li>Use <strong>Suitable backfill materials<\/strong> Avoid introducing new pollutants.<\/li>\n<li>Preparing <strong>Completion Report<\/strong> It serves as proof before regulatory authorities.<\/li>\n<\/ol>\n<\/section>\n<p><!-- FAQ Section --><\/p>\n<section id=\"faq\">\n<h2>Frequently Asked Questions about Environmental Verification and Mining Site Remediation<\/h2>\n<div class=\"faq-item\">\n<h3>What are the steps for environmental verification of a non-operational mining site?<\/h3>\n<p>Environmental verification steps include: desk review of documents, field inspection to monitor open pits and waste, environmental and safety risk assessment, and then preparation of a technical report documented with photographs that includes remediation recommendations and lockdown measures<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h3>How are exploratory drilling operations handled at mining sites?<\/h3>\n<p>Exploratory drilling is handled by identifying its location in the field, then using leveling equipment to backfill it with suitable soil (preferably the drilling output itself),  then the surface is leveled to eliminate differences in elevation and improve evenness, while applying safety and environmental controls during implementation.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h3>What is the importance of the environmental compliance report?<\/h3>\n<p>The Completion of Settlement Report is a regulatory proof document that confirms the implementation of the required treatment, documents the condition before and after the procedure, supports the environmental compliance path before regulatory authorities, and reduces legal and operational risks.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h3>What are the environmental risks of open pit mining at non-operational mining sites?<\/h3>\n<p>The risks include: rainwater accumulating and creating an insect breeding ground, collapse of excavation sides, risks of falling and tripping, excavations becoming collection points for debris, and dust being stirred up from loose materials.<\/p>\n<\/div>\n<\/section>\n<p><!-- Related Services --><\/p>\n<section id=\"related\">\n<h2>Related services<\/h2>\n<p class=\"translation-block\">Al-Buad Environmental Consulting Company offers a comprehensive package of environmental services that support the mining and industrial sectors in Saudi Arabia:<\/p>\n<ul>\n<li>Checking the current environmental status of the sites<\/li>\n<li>Environmental Auditing<\/li>\n<li>Environmental risk assessment<\/li>\n<li>corrective action plans<\/li>\n<li>Environmental management plans<\/li>\n<li>Supporting permit requirements and environmental compliance<\/li>\n<\/ul>\n<\/section>\n<p><!-- Author Box \/ EEAT --><\/p>\n<aside class=\"author-box\" aria-label=\"\u0639\u0646 \u0627\u0644\u0643\u0627\u062a\u0628\">\n<h3>About Environmental Dimension Company<\/h3>\n<p><strong>The environmental dimension of environmental consulting<\/strong> It is a Saudi company specializing in providing <strong>Environmental consulting<\/strong> And<strong>Environmental assessment studies<\/strong> And<strong>Addressing the affected sites<\/strong> For the mining, industrial, and infrastructure sectors in Saudi Arabia. Our team has extensive field experience in <strong>Checking the current environmental situation<\/strong> Preparation <strong>Completion reports<\/strong> And support for regulatory compliance in accordance with local and international regulations and standards.<\/p>\n<p><a href=\"https:\/\/albuad.sa\/en\/about-us\/\">Get to know our team<\/a> | <a href=\"https:\/\/albuad.sa\/en\/contact-us\/\">Contact us<\/a><\/p>\n<\/aside>\n<p><!-- CTA --><\/p>\n<div class=\"cta-box\">\n<h3>Do you need an environmental verification or remediation of an affected site?<\/h3>\n<p>The Environmental Dimension team is ready to assist you in assessing the condition of your site and preparing environmental remediation and settlement plans. <a href=\"https:\/\/api.whatsapp.com\/send\/?phone=966535733690&amp;text&amp;type=phone_number&amp;app_absent=0\" target=\"_blank\" rel=\"noopener\">Request a free technical consultation<\/a> today.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u062f\u0631\u0627\u0633\u0629 \u062d\u0627\u0644\u0629 \u0645\u0643\u062a\u0645\u0644\u0629 \u0644\u0645\u0648\u0642\u0639 \u062a\u0639\u062f\u064a\u0646\u064a \u063a\u064a\u0631 \u0641\u0644\u0632\u064a \u0641\u064a \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629: \u0645\u0646 \u0631\u0635\u062f \u0627\u0644\u062d\u0641\u0631 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0625\u0644\u0649 \u0631\u062f\u0645\u0647\u0627 \u0648\u062a\u0633\u0648\u064a\u062a\u0647\u0627 \u0648\u0625\u0635\u062f\u0627\u0631 \u062a\u0642\u0631\u064a\u0631 \u0625\u062a\u0645\u0627\u0645 \u0645\u0648\u062b\u0642 \u0641\u0631\u064a\u0642 \u0627\u0644\u0628\u0639\u062f \u0627\u0644\u0628\u064a\u0626\u064a \u0644\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u0627\u062a \u0627\u0644\u0628\u064a\u0626\u064a\u0629 \u0622\u062e\u0631 \u062a\u062d\u062f\u064a\u062b: 24 \u0623\u063a\u0633\u0637\u0633 2026 \u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629: 8 \u062f\u0642\u0627\u0626\u0642 \u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u062d\u062a\u0648\u064a\u0627\u062a \u0645\u0642\u062f\u0645\u0629: \u0644\u0645\u0627\u0630\u0627 \u064a\u062d\u062a\u0627\u062c \u0627\u0644\u0645\u0648\u0642\u0639 \u063a\u064a\u0631 \u0627\u0644\u062a\u0634\u063a\u064a\u0644\u064a \u0625\u0644\u0649 \u062a\u062d\u0642\u0642 \u0628\u064a\u0626\u064a\u061f \u0646\u0637\u0627\u0642 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u0642\u062f\u0645\u0629 \u0645\u0646\u0647\u062c\u064a\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630: \u0645\u0646 \u0627\u0644\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0645\u0643\u062a\u0628\u064a\u0629 \u0625\u0644\u0649 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3373,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,1],"tags":[],"class_list":["post-3371","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-43","category-1"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"_links":{"self":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts\/3371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/comments?post=3371"}],"version-history":[{"count":3,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts\/3371\/revisions"}],"predecessor-version":[{"id":3381,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/posts\/3371\/revisions\/3381"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/media\/3373"}],"wp:attachment":[{"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/media?parent=3371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/categories?post=3371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/albuad.sa\/en\/wp-json\/wp\/v2\/tags?post=3371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}